Friday, 19 September 2008

Event Diagram / Chart

After some intensive research I was able to complete the event diagram / chart that will be used by the team when time comes to program and begin the beginning part of the layout designs.

I can now begin with the next part of project.

Friday, 5 September 2008

Project Design Document

My part to the Project Design Document was completed this week. I was assigned to provide information on checkpoints. The Rules of Engagement for checkpoints and what happen in checkpoints.

The information that I found during my research was condensed into a document that would educate people on how checkpoints are created, detailing things such as what is needed, how to set up area to be used as a checkpoint and the differences between two types of checkpoints deliberate and hasty.

I have now begun to conduct my research so that I can actually create an event flow diagram / chart for checkpoints. This information would greatly help with our development with the project, especially in the programming stage.